ANGOLA |
|||||||
|
|
Angola report 2001 [7]OPERATIONS Emergency Task still waits for fundingThe most drastic to look at was the ordnance
stockpile at the end of the runway in Luanda.
This used to be a very large depot until an
accident in 1992 that resulted in one area of
the depot being destroyed and ordnance being
sprayed over a large area. Much of the ordnance,
mostly aircraft deployed, that could be re-used
was moved to a safer location the rest left
out of sight. Luanda is continually undergoing
expansion, due to the influx of displaced persons
from the countryside, with one new Bairro being
opened in on the site of this old ordnance dump.
This was brought to the attention of MgM by
INAROEE after accidents occurred there. Funds
are still being sought to allow MgM to train
and mobilise a specialist EOD Team to clear
the Bairro before any more accidents occur. More requestsThe mission to Huambo was at the request of the Provincial Governor, and is related to opening up initially around 100 kms of track. The first 40 kms is to the town of Ca'ala, this would allow food and other supplies to be moved to the IDP Camps around the town by rail, and then 60 kms of track from a branch line to the south of Ca'ala. This would have the benefit of supporting the IDP communities outside Huambo without having to put more pressure on the crumbling road network, and allow railway engineers to remove the unwanted track on the branch line, that will be restored for use on broken portions of the mainline. Eventually with the mainline open to Lobito building materials can be easily transported to Huambo, and Kuito, to facilitate reconstruction. |
||||||
|
|||||||
|
|||||||
|
|
|||||||